Reference

Projects
Prestigious Projects

Power and Water - Industrial - Commercial

Power and Water

Jeddah RO Plant

Project Scope

This project includes complete civil engineering works for the desalination plant in Jeddah. The scope of the work is as follows:

  • ON SHORE CIVIL WORKS:
  • Site preparation, dewatering, piling, sheet piling, R.C.C. equipment, water channels, culverts, foundations , pipe works, road and paving, etc.

  • CIVIL WORKS FOR INTAKE REHABILITATION:
  • Intake rehabilitation work consists of civil engineering works like demolition, shoring, dewatering, earthwork, concrete work, coating and painting work, joint work, steel and GRP work, and paving work.

  • CIVIL WORKS FOR BUILDINGS:
  • Building works (27,764 M2) consist of earthwork, concrete and formwork, pre-engineered building, steel work, masonry and plastering work, floor finish work, wall finish work, ceiling work, roofing work, waterproofing and damp proofing work, windows, doors and elevator work.

Sharourah Power Plant

Project Scope

    Complete civil works for extension of PP comprising three gas turbine units, treated/untreated distilled tank of capacity 50,000 m3, fire water tank foundation, fire pump room, compressor room, switchgear building, fuel oil treatment/transfer forwarding room, fuel oil unloading station room, demonstration tank foundation, water treatment plant, site development, fence, lighting pole, etc.; GT units and other foundations are based upon pile foundations.

380kV PP8 Substation, Riyadh

Project Scope

  • Complete civil works for 380kV GIS building having a one-story precast concrete structure building with a cable tunnel. Design and construction of multistoried (precast structure) control/switch gear building with control room, 13.8 kV switchgear room, AC/DC auxiliary room, battery room, communication room, relay test room, office, toilet and store.

  • Cable basement was provided under the 13.8 kV switchgear, AC/DC room, auxiliary room and part of the corridor. Design and construction of foundations for power transformer, auxiliary transformer, power cable and communication, duct banks with manholes, hand holes, trenches, lattice structures and outdoor equipment foundation.

  • Complete site development of 25,000 m2 comprising asphalt paving, gravelling, fencing SSD, guard house and gate, etc.

380kV Rabigh Substation

Project Scope

  • 380 kV –S/S – Rabigh-2 power plant, project is situated in Rabigh, 150 km from Jeddah.

  • Complete civil works involved for 380kV S/S Rabigh-2 power plant comprising 380 kV GIS building including tunnels, control building with partial basement, GIL station building, power transformer & service transformers foundations , duct banks, trenches and outdoor foundations such as Gib foundation lighting pole and surge arrestor foundation, etc.

  • Complete site development and infrastructure works which consist of a large area of asphalting and road network, fencing and gate, etc.

Industrial

Ceramics factory

Project Scope

  • One of the prestigious projects is alfanar industrial city, comprising a warehouse building on an area of 39,106 m2 and a four-story admin building on a built-up area of 6,678 m2.
  • The admin building is having a steel structure membrane with structural glazed curtain walls at the elevation.
  • In addition to that, alfanar Bena has completed all the major foundation works for equipment for the ceramic factory, gen-set room and water tank. It has also carried out the site development works.
  • Cables factory

    Project Scope

  • The scope of this project included complete civil engineering works for a warehouse built on 32,000 m2 and a three-story admin building on a built up area 5,000 m2.
  • The admin building is having a steel structure membrane with structural glazed curtain walls at the elevation.
  • Precast Factory

    Project Scope

    The project is situated in Riyadh. It spreads on 242,000 m2 comprising:

    • Factory building
    • Stockyard
    • Admin building
    • Concrete ready mix plant and control building
    • Workshop, mosque and water tank
    • Site development and landscaping

    The construction for the factory building is based on prefabricated columns and beams connected to the reinforced concrete pedestal and covered with metal truss roof and sandwich panel wall cladding.

    A large area of site development involved asphalting, gravelling, paving and landscaping works.

    Commercial

    Al-Imam Muhammed ibn Saud Islamic University, Female Study Center

    Project Scope

  • The project is situated on the campus of the existing Imam University for female study – phase 5 in Riyadh.

  • Complete civil engineering works will be done for the concrete skeleton of the five-story building of different levels comprising more than 108,000 m2 covered area. The major part of the slab will be waffle slab.
  • alfanar Trading Building

    Project Scope

    The project scope included civil engineering works for a two-story admin building on 3000 m2, over a 6000 m2 basement parking lot for 150 cars, and warehouses on a 13,700 m2 area.

    • Complete civil engineering work for the warehouse and administration building comprising a 35000 m2 built up area.

    • Project consists of a steel structure building for the warehouse and cast in site structure for the admin building.

    • A big amount of cutting and filling was involved in this project. The quantity of concrete used in the project was 75,000m3.

    alfanar Industrial city

    Project Scope

    • In line with alfanar group's major industrial expansion plans, the multi-billion alfanar industrial city project was developed in Riyadh's Third Industrial Zone. This project aims to bolster the manufacturing activities of alfanar and to build and expand a multi-product manufacturing complex.
    • The alfanar industrial city anchors several industrial and commercial activities and it is the only independent privately developed zone in the region. The industrial city spreads across an enormous 675, 000sq m area, housing two industrial zones, a commercial zone and other facilities.

    • The industrial city has over six new industrial units in addition to alfanar's existing industrial units.

    • A new state-of-the-art ceramics factory is operational in one of the two industrial zones and the rest is occupied by manufacturing units for MV-LV products, wires and cables, transformers, wooden reels, PVC compounds, etc.
    • The ceramics industries zone comprises of industrial units for making ceramics and porcelain floor and wall tiles.
    • Furthermore, the industrial city has a commercial zone consisting of commercial offices, showrooms and other facilities.
    • The establishment of ultra-modern infrastructure facilities complete a strong logistics hub, the project was developed on a BOO basis.

    Ongoing Projects

    No.

    Project Name

    Client Name

    Start Date

    Completion Date

    Value (SR)

    1

    Residential and Industrial Complex expansion -Khurais AL crude increment project

    Saudi Aramco

    Oct-15

    Dec-17

    230,000,000

    2

    Civil works for Saudi Aramco Khurais CPF expansion and Sat GOSP and staellite

    Saudi Aramco / Saipem

    March-16

    April-18

    300,000,000

    3

    Building works at (Package 12) Naphta and Aromatics Complex of Jazan Refinery and Terminal Project

    Saudi Aramco /Daewoo E&C JV JGC

    June-15

    Aug-16

    50,000,000

    4

    Building works of Rabigh II Refining and Petrochemical Project CP3/4 package

    Saudi Aramco /GS Engineering

    April-13

    March-16

    150,000,000

    5

    Construction of Industrial Buildings Technical And Non technical at PP13 in Riyadh

    SEC

    May-15

    July-16

    230,000,000

    6

    Construction of building works for AlFanar Labour camp

    alfanar Properties

    April-14

    July-17

    188,000,000

    7

    Construction of Building works for 380 KV Substation at shuqaiq steam power plant

    SEC / HHI

    March-14

    March-16

    50,000,000

    8

    Civil and Building works for Power Block #1,#2 & CCB area at shuqaiq steam power plant

    SEC / HHI

    June-14

    Dec-16

    270,000,000

    Completed Projects

    No.

    Project Name

    Client Name

    Location

    Start Date

    Target Date

    Value (SR)

    1

    Building Works for Jubail Polysilicon Plant

    Polysilicon Technology Co. / Hyundai Engineering 

    Jubai

    Jul-13

    Jun-14

     

    2

    Civil ,Intake Rehabilitation & Building works of Jeddah R.O Plant – Phase III

    SWCC/Doosan 

    Jeddah

    July-09

    December-13

    156,000,000

    3

    Architectural Work of Whole Power Plant (Package b), Rabigh 2 x 660MW IPP-1 Project 

    RABEC/SEPCO III

    Rabigh

    July-09

    decmber2011

    35,390,164

    4

    Construction of Heavy Fuel Oil Tank Foundation (Package B) , Rabigh 2 x 660MW IPP-1 Project 

    RABEC/SEPCO III

    Rabigh

    November-11

    May-12

    32,501,728

    5

    Civil Works of 380kV Switching Substation, Rabigh 2 x 660MW IPP-1 Project

    RABEC/SEPCO III

    Rabigh

    July-09

    September-11

    28,968,099

    6

    Construction of BOP Buildings, Rabigh 2 x 660MW IPP-1 Project

    RABEC/SEPCO III

    Rabigh

    December-11

    September-13

    31,616,242

    7

    Civil & Building  Works (Package #4 ) of Rabigh Power Plant No.2  

    SEC/Doosan 

    Rabigh

    November-11

    December-13

    68,000,000

    8

    Construction of the concrete structure of the buildings in the stage # 5 at king abdullah bin abdulaziz city for students

    Al-Imam Muhammad bin Saud Islamic University

    Riyadh 

    April-09

    March-10

    57,000,000

    9

    Precast Factory 

    alfanar

    Riyadh 

    December-08

    July-09

    17,000,000

    10

    Transformer, Cables ,MV ,LV Factories at AlFanar Industrial City 

    alfanar

    Riyadh 

    May-07

    April-09

    48,000,000

    11

    Aluminuim Factory 

    alfanar

    Riyadh 

    August-08

    July-09

    27,000,000

    12

    Ceramic Factory 

    alfanar

    Riyadh 

    August-07

    May-09

    35,000,000

    13

    Central Marketing & Trading Center Building

    alfanar

    Riyadh 

    June-07

    April-09

    45,000,000

    References

    Client References

    Client List

    • Saudi Aramco (Saudi Arabian oil Co.)
    • SEC ( Saudi Electricity Co )
    • SWCC (Saline water conversion Corporation )
    • RABEC
    • SABIC
    • Maaden
    • Ministry of Higher Education
    • Imam Mohammed bin Saud University
    • Doosan Heavy industries
    • SEPCO
    • Polysilicon technology Co
    • Hyundai Heavy Industries Co
    • Hyundai Engineering and construction
    • Samsung Engineering
    • Daewoo E&C
    • JGC
    • GS
    • Kcc